The runway extension and rehabilitation didn’t come a moment too soon, Klein points out. With the longer runway, carriers are now able to operate aircraft at optimum capacities, thus increasing their own efficiency and enhancing service for travelers. In addition to sacrificing revenue, the carriers incurred operational complications by having to constantly monitor temperatures to determine whether they could carry full passenger loads. ![]() As a result, TVC’s three airlines (American, Delta, United) were taking penalties-up to 14 passengers for larger aircraft and three or four for lighter planes. Prior to the recent improvements, airlines had to lighten aircraft loads during summer months to achieve adequate lift during takeoff, explains Airport Director Kevin Klein. The 115-foot extension was the sequel to a 2013 project that extended the 6,500-foot east/west runway to 6,900 feet. ![]() The $14 million project renovated and extended TVC’s primary runway to 7,015 feet, thus remedying previous operational limitations. ![]() With the completion of an award-winning runway project at Cherry Capital Airport (TVC), Traverse City, MI, is well prepared to welcome travelers to Northern Michigan for the summer tourist season.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |